|
Chairman |
Secretary |
| ADVISORY GROUPS | |||
| Ref | Title | Convener | Duration |
| AG A1.1 | Turbine Type Generators | Robert Fenton | Permanent |
| AG A1.2 | Hydro Type Generators | Remi Tremblay | Permanent |
| AG A1.5 | New Technologies | Sameh Salem | Permanent |
| AG A1.6 | Large Motors | Enzo Tortello | Permanent |
| Working Groups - Task Forces | |||
| Ref | Title | Convener | Dates (Creation - Disbanding) |
| A1.01 | Guide on Overfluxing Generators | Neil Connolly | 2008 - 2010 |
| A1.02 | Generator Stator Winding Stress Grading Coating Problem | Remi Tremblay | 2008 - 2010 |
| A1.03 | Guide on Generator/Power System Inter-relationship Issues | L Rouco | 2008 - 2012 |
| A1.04 | Generator Fire Protection | Alexander Gromow | 2008 - 2011 |
| A1.05 | Economic Evaluation of Generator Refurbishment/Replacement | Sam Salem | 2008 - 2012 |
| A1.11 | Guide for On Line Monitoring of Electrical Generators | Dan Zlatanovic | 2004 - 2010 |
| A1.12 | State of the Art of the Efficiency in Hydro-Generators Commissioned in the Last 10 Years | Hector D. Pires | 2009 - 2011 |
| A1.13 | Feasibility of Updating from Class F to Class H the Insulation Systems in Electrical Rotating Machines | Jose L. G. Araco | 2008 - 2011 |
| A1.14 | Guide for Minimizing the Damage from Stator Winding Grounds in Hydro Generators | Oscar Martinez | 2008 - 2011 |
| A1.15 | Guide on Stator Water Chemistry Management | Francois Duffeau | 2006 - 2010 |
| A1.16 | Guide on Generator Coil Retaining Ring – A Survey and General Guideline | Gert Coetzee | 2006 - 2010 |
| A1.17 | Methods of Determining the Condition of Stator Winding Insulation and their Effectiveness | Sergio R. Ruiz | 2008 - 2011 |
| A1.18 | Extending Life of Large Motors in Nuclear Power Stations | M R Siniscalchi | 2008 - 2010 |
| A1.19 | Motor Failure Survey | V Skundric | 2008 - 2010 |
| A1.21 | Bearing Segments with Plastic Lining – Operating and Maintenance Experience | Lars E Kampe | 2009-2011 |
| A1.22 | Guide – Consideration of Duty on Windings | M Berlamont | 2010 - 2011 |
| A1.23 | State of the Art and Capacity for Robotic Inspection of Turbo-Generators | M R Siniscalchi | 2010 - 2011 |
| A1.24 | Literature Survey on Diagnostics Trends for Wind Generators for Reliability Improvement | S Salem | 2010 - 2012 |
| A1.25 | Survey on Hydro-Generator Cleaning | Geir Aalvik | 2010 - 2013 |