Structure

The CIGRE Study Commitee A1 - Rotating Electrical Machines consists of Advisory Groups, Working Groups and Task Forces. Each Group reporting to the Study Committee Chairman.

At this time the Study Committee has 4 Advisory Groups and 16 Working Groups.

Chairman

Erli Figueiredo

Secretary

Oscar Martínez Oterino

ADVISORY GROUPS
Ref Title Convener Duration
SCA1-AG1 Turbine Type Generators Robert Fenton 2004-2008
SCA1-AG2 Hydro Type Generators Remi Tremblay 2007-2010
SCA1-AG5 Special Machines Swarn Kalsi 2004-2008
SCA1-AG6 Power Station Motors Enzo Tortello 2004-2008
Working Groups - Task Forces
Ref Title Convener Dates (Creation - Disbanding)
SCA1.01.12 a. Guide – Generator Coil Retaining Ring – A Literature Survey and General Guideline David Tarrant 2002-2006
SCA1.01.13 Guide on Stator Water Chemistry Management David Tarrant 2002 2006
SCA1.01.14 Study of Maintenance, Inspection and Test Programs John Linton 2005 2006
SCA1.01.16 Update on On Line Monitoring Dan Zlatanovic 2004 2007
SCA1.01.19 Guide for Prevention of and Minimizing the Damage from Stator Winding Grounds Oscar Martinez 2004 2007
A1.01-21 Economic Evaluation of Generator Refurbishment/Replacement Sam Salem 2008 - 20012
A1.01-22 Guide on Overfluxing Generators Neil Connolly 2008 - 20012
A1.01-23 Guide on Generator/Power System Inter-relationship Issues Gert Coetzee 2008 - 20012
SCA1.02-1 Intermittent Operation Don Maclaren 2005 2007
SCA1.02-3 Generator Fire Protection Guidelines Alexander Gromow 2008 - 20012
SCA1.02-5 Generator Stator Winding Stress Grading Coating Problem José Carlos Borgmann
SCA1.06-10 Large Motors for Nuclear Power Stations Jim Oliver 2005 2008
SCA1.06-11 Magnetic Wedges Operating Experience Helen Rouke 2004 2006
SCA1.06.12 Motor Failure Survey V Skundric 2004 2006







www.cigre.org